Pending
26/002098/DISCHG - Compliance with Planning Condition(s)
Description
Discharge of conditions C4 (surface water drainage), C5 (lighting details) and C
Nearby new applications
Historical activity at this location
10 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
2025
Approved
Extension of existing onsite testing ground hardstanding area located southwest of Factor…
2025
Construction of new substation with changes to cable runs, provision of new ring main uni…
2024
Approved
Variation of condition C2 (drainage) pursuant to planning permission 23/01048/FUL
2024
Approved
Discharge of conditions C3 (contamination reports), C4 (remediation plan) and C7 (WSI) of…
2023
Approved
Construction of 2no. machine workshop buildings within existing testing ground area
2021
Approved
Construction of Solar PV development to include installation of ground based racking syst…
2020
Approved
Variation of condition C2 (changes to Photovoltaic Solar Array size) of planning permissi…
2020
Approved
Discharge of Condition C5 (landscaping & maintenance scheme) on planning permission 20/00…
2020
Approved
Construction of Solar PV Development to include installation of ground based racking syst…
2020
Approved
Screening opinion for construction of Solar PV Development to include installation of gro…
Peterborough
Planning Authority Score
5.2/10
Average
#137 of 292 councils
Relevant to this application:
Householder decisions
Peterborough ranks #155 out of 292 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
Peterborough decision performance
Based on MHCLG data, 2025
84%
Overall approval rate
Below avg (87%) #223 of 292
89%
Householder approved
Below avg (90%) #207 of 292
64%
Decided in 8 weeks
Above avg (64%) #155 of 292
31%
Extended time limit
Below avg (40%) #63 of 292
70%
Minor dwellings approved
46 decided (1-9 homes)
63%
Major dwellings approved
19 decided (10+ homes)
65%
Change of use approved
74 decided
706
Total decisions
116 refused in 2025