Hill Farm Rectory Road Topcroft Norfolk NR35 2BT
Pending Consideration
2026/0586
Description
Installation of a ground source heat pump which requires changes to be made to the layout of existing single storey extension. Replacement of existing concrete pantile roof covering with clay pantiles. Removal of exterior door located in the kitchen.
Historical activity at this location
6 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2023
With conditions
Hill Farm Cottage Rectory Road Topcroft Norfolk NR35 2BT
Non-Material Amendment to planning permission 2023/0119 - Minor changes to west elevation…
2023
With conditions
Hill Farm Cottage Rectory Road Topcroft Norfolk NR35 2BT
Non-Material Amendment to planning permission 2023/0119 - Minor changes to west elevation…
2023
With conditions
Hill Farm Cottage Rectory Road Topcroft Norfolk NR35 2BT
Erection of two-storey side and rear extension. New gable roof following removal of exist…
2023
With conditions
Hill Farm Cottage Rectory Road Topcroft Norfolk NR35 2BT
Erection of two-storey side and rear extension. New gable roof following removal of exist…
South Norfolk Broadland
Planning Authority Score
6.4/10
Average
#81 of 292 councils
Relevant to this application:
Householder decisions
South Norfolk Broadland ranks #117 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
South Norfolk Broadland decision performance
Based on MHCLG data, 2025
94%
Overall approval rate
Above avg (87%) #31 of 292
96%
Householder approved
Above avg (90%) #45 of 292
70%
Decided in 8 weeks
Above avg (64%) #117 of 292
41%
Extended time limit
Above avg (40%) #153 of 292
83%
Minor dwellings approved
137 decided (1-9 homes)
88%
Major dwellings approved
17 decided (10+ homes)
97%
Change of use approved
35 decided
1,050
Total decisions
63 refused in 2025
