Bella Vista Chapel Lane Upper Broughton Nottinghamshire LE14 3BB
Pending Decision
26/00509/FUL
Description
Proposed rear extension and relocation of Oil tank
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
With conditions
The Old Chapel Chapel Lane Upper Broughton Nottinghamshire LE14 3BB
To partially re-open side boundary wall & construct steps down to garden
2025
With conditions
The Old Chapel Chapel Lane Upper Broughton Nottinghamshire LE14 3BB
To partially re-open side boundary wall & construct steps down to garden
2023
With conditions
Peach Tree Stables Rectory Drive Off Main Road Upper Broughton Nottinghamshire LE14 3BG
Demolition of glass and timber link, and construction of rear single storey extension
2022
With conditions
Tap And Run Main Road Upper Broughton Nottinghamshire LE14 3BG
Replacement and re-roofing works, rebuilding of gables, repairs to masonry, replacement o…
2022
With conditions
Suffolk House Rectory Drive Upper Broughton Melton Mowbray Nottinghamshire LE14 3BF
Construction of extension to an existing first floor balcony includes addition of an exte…
2021
With conditions
Hill Farm Bottom Green Upper Broughton Melton Mowbray Nottinghamshire LE14 3BA
Replace existing beam; install steel plate to window lintel to form flitch beam repair; R…
2021
With conditions
Hill Farm Bottom Green Upper Broughton Melton Mowbray Nottinghamshire LE14 3BA
Replace existing beam; install steel plate to window lintel to form flitch beam repair; R…
2021
Withdrawn
Hill Farm Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Internal alterations to repair existing beam, to insert an oak-clad steel beam & repairs…
2021
Withdrawn
Hill Farm Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Internal alterations to repair existing beam, to insert an oak-clad steel beam & repairs…
2021
Withdrawn
Hill Farm Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Replace first floor above the playroom by removing central beam and lime ash floor and re…
2021
Withdrawn
Hill Farm Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Replace first floor above the playroom by removing central beam and lime ash floor and re…
2020
With conditions
Southdown House Rectory Drive Upper Broughton Nottinghamshire LE14 3BF
Construct summer house with raised deck/balcony and potting shed area attached to existin…
2020
With conditions
Southdown House Rectory Drive Upper Broughton Nottinghamshire LE14 3BF
Construct summer house with raised deck/balcony and potting shed area attached to existin…
2020
With conditions
Suffolk House Rectory Drive Upper Broughton Nottinghamshire LE14 3BF
Construction of detached garden room in front garden
2020
With conditions
Suffolk House Rectory Drive Upper Broughton Nottinghamshire LE14 3BF
Construction of detached garden room in front garden
2018
With conditions
The Golden Fleece Main Road Upper Broughton Nottinghamshire LE14 3BG
New signage including 1x fascia sign, 1x pictorial panel, 1x signwritten sign, 1x amenity…
2018
With conditions
The Golden Fleece Main Road Upper Broughton Nottinghamshire LE14 3BG
New signage including 1x fascia sign, 1x pictorial panel, 1x signwritten sign, 1x amenity…
2017
With conditions
White House Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Partial demolition of boundary wall.
2017
With conditions
White House Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Partial demolition of boundary wall and construction of new vehicular access including ne…
2017
With conditions
White House Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Partial demolition of boundary wall.
2017
With conditions
White House Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Partial demolition of boundary wall and construction of new vehicular access including ne…
2016
With conditions
The Golden Fleece Main Road Upper Broughton Nottinghamshire LE14 3BG
Construction of new single storey extension, 2no. new patio doors and relocation of exist…
2016
With conditions
The Golden Fleece Main Road Upper Broughton Nottinghamshire LE14 3BG
Construction of new single storey extension, 2no. new patio doors and relocation of exist…
2016
Withdrawn
White House Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Construction of vehicular access, boundary wall and gates and partial demolition of bound…
2016
Withdrawn
White House Bottom Green Upper Broughton Nottinghamshire LE14 3BA
Construction of vehicular access, boundary wall and gates and partial demolition of bound…
Rushcliffe
Planning Authority Score
3.9/10
Below average
#202 of 292 councils
Relevant to this application:
Householder decisions
Rushcliffe is slower than most councils at deciding householder applications, ranking #219 out of 292. 47% of applications have the time limit extended, above the 40% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).
Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Rushcliffe decision performance
Based on MHCLG data, 2025
91%
Overall approval rate
Above avg (87%) #104 of 292
94%
Householder approved
Above avg (90%) #115 of 292
54%
Decided in 8 weeks
Below avg (64%) #219 of 292
47%
Extended time limit
Above avg (40%) #204 of 292
72%
Minor dwellings approved
65 decided (1-9 homes)
89%
Major dwellings approved
18 decided (10+ homes)
91%
Change of use approved
11 decided
785
Total decisions
72 refused in 2025
