6 Firdale Somerby Leicestershire LE14 2PU
Unknown
26/00141/FULHH
Description
Construction of a two-storey and single storey rear extensions, additional of a porch and erection of a detached garage with first floor residential accommodation for use as an annexe.
Nearby new applications
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2023
Approved
1 Firdale Somerby Leicestershire LE14 2PU
Single storey side extension
2023
Approved
1 Firdale Somerby Leicestershire LE14 2PU
Single storey side extension
2023
Approved
11 Firdale Somerby LE14 2PU
Two storey side and single storey rear extension. Resubmission of 22/01151/FULHH.
2023
Approved
11 Firdale Somerby LE14 2PU
Two storey side and single storey rear extension. Resubmission of 22/01151/FULHH.
2022
Refused
11 Firdale Somerby LE14 2PU
Single storey rear extension, two storey side extension.
2022
Refused
11 Firdale Somerby LE14 2PU
Single storey rear extension, two storey side extension.
2022
Approved
1 Oakham Road Somerby LE14 2QF
Proposed erection of a dwelling and associated works
2022
Approved
1 Oakham Road Somerby LE14 2QF
Proposed erection of a dwelling and associated works
2022
Approved
10 Firdale Somerby LE14 2PU
Detached workshop with storage over
2022
Approved
10 Firdale Somerby LE14 2PU
Detached workshop with storage over
2022
Approved
11 Firdale Somerby LE14 2PU
Single storey rear and side extension.
2022
Approved
11 Firdale Somerby LE14 2PU
Single storey rear and side extension.
2022
Approved
1 Oakham Road Somerby LE14 2QF
Proposed demolition of existing garage and ground floor connection. New two storey side e…
2022
Approved
1 Oakham Road Somerby LE14 2QF
Proposed demolition of existing garage and ground floor connection. New two storey side e…
2021
Approved
1 Firdale Somerby LE14 2PU
Single storey side extension
2021
Approved
1 Firdale Somerby LE14 2PU
Single storey side extension
2020
Approved
2 Oakham Road Somerby LE14 2QF
Proposed two storey side extension and single storey rear extension.
2020
Approved
2 Oakham Road Somerby LE14 2QF
Proposed two storey side extension and single storey rear extension.
2017
Withdrawn
Field OS 3300 Oakham Road Somerby
Residential development for up to 31no dwellings (re-submission of 16/00100/OUT).
2017
Withdrawn
Field OS 3300 Oakham Road Somerby
Residential development for up to 31no dwellings (re-submission of 16/00100/OUT).
2016
Refused
Field OS 3300 Oakham Road Somerby
Residential development for up to 32 no. dwellings
2016
Approved
3 Owston Road Somerby LE14 2PN
Proposed single storey rear extension
2016
Approved
3 Owston Road Somerby LE14 2PN
Proposed single storey rear extension
2016
Approved
13 Firdale Somerby LE14 2PU
Porch extension.
2016
Approved
13 Firdale Somerby LE14 2PU
Porch extension.
Melton
Planning Authority Score
2.5/10
Poor
#249 of 292 councils
Relevant to this application:
Householder decisions
Melton is one of the slowest councils in England for householder decisions, ranking #292 out of 292. The council extends the time limit on 80% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Melton decision performance
Based on MHCLG data, 2025
95%
Overall approval rate
Above avg (87%) #22 of 292
95%
Householder approved
Above avg (90%) #76 of 292
7%
Decided in 8 weeks
Below avg (64%) #292 of 292
80%
Extended time limit
Above avg (40%) #291 of 292
94%
Minor dwellings approved
49 decided (1-9 homes)
94%
Major dwellings approved
16 decided (10+ homes)
67%
Change of use approved
6 decided
293
Total decisions
14 refused in 2025
