Unit 36 Stoneferry Park Foster Street Kingston Upon Hull HU8 8BT
Pending Consideration
26/00258/FULL
Description
Erection of two storey office block to link to the existing warehouse
Nearby new applications
Historical activity at this location
8 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Approved
Land On Foster Street, Stoneferry Park, Wilmington, Hull, Stoneferry, HU8 8BT
Erection of Two Electricity Substations (Retrospective Planning Application)
2025
Refused
Land Adjacent To Foster Street, Kingston Upon Hull HU8 8BT
Advertisement consent application for the: Installation of a new free standing 48 sheet d…
2022
Approved
Ashcourt Contracts Ltd Recycling Site Foster Street Kingston Upon Hull HU8 8BT
Installation/construction of a wash plant in association with existing concrete plant
2022
Approved
Concrete Batching Plant Foster Street Kingston Upon Hull HU8 8BT
Erection of wind turbine of up to 77m (253ft) in height (blade tip) with ancillary develo…
2019
Refused
Ashcourt Contracts Ltd Concrete Batching Plant Foster Street Kingston Upon Hull HU8 8BT
discharge of conditions for 16/00906/FULL - Erection of single wind turbine of up to 77m…
2019
Approved
Unit 40 Stoneferry Park Foster Street Kingston Upon Hull HU8 8BT
Installation of flues for biomass boiler
2018
Approved
SGS Ltd Unit 39 Foster Street Kingston Upon Hull HU8 8BT
Non material amendment for 17/00537/FULL - Erection of a detached single story building t…
2016
Approved
Foster House Foster Street Kingston Upon Hull HU8 8BT
1. Change of use from offices (B1 a use) to offices (B1 a use) at first floor and warehou…
Hull
Planning Authority Score
2.7/10
Poor
#242 of 292 councils
Relevant to this application:
Householder decisions
Hull is slower than most councils at deciding householder applications, ranking #199 out of 292. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).
Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application.
View full council performance
Hull decision performance
Based on MHCLG data, 2025
92%
Overall approval rate
Above avg (87%) #83 of 292
90%
Householder approved
Above avg (90%) #187 of 292
57%
Decided in 8 weeks
Below avg (64%) #199 of 292
55%
Extended time limit
Above avg (40%) #252 of 292
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
10 decided (10+ homes)
89%
Change of use approved
37 decided
412
Total decisions
35 refused in 2025