39 Park Road Beer Devon EX12 3HJ
Unknown
26/0544/DOC
Description
Discharge of conditions for 26/0058/FUL : Condition 5 (Cladding)
Nearby new applications
Historical activity at this location
10 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2023
Approved
30 Park Road Beer EX12 3HJ
Single storey front / side extension to dwelling
2021
Approved
29 Park Road Beer Seaton EX12 3HJ
Construction of single storey rear extension.
2021
Approved
29 Park Road Beer Seaton EX12 3HJ
Construction of single storey rear extension.
2019
With conditions
20 Park Road Beer Seaton EX12 3HJ
Hip to gable extension and construction of dormer window to rear.
2019
Approved
24 Park Road Beer Seaton EX12 3HJ
Hip to gable extension and dormer to rear.
2019
Withdrawn
20 Park Road Beer Seaton EX12 3HJ
Hip to gable extension and construction of dormer window to rear.
2019
Refused
24 Park Road Beer Seaton EX12 3HJ
Hip to gable enlargement and construction of dormer window to rear
2019
Withdrawn
24 Park Road Beer EX12 3HJ
Hip to gable enlargement and construction of dormer window to rear.
2018
With conditions
32 Park Road Beer Seaton EX12 3HJ
Demolition of existing structure and replace with a single storey rear extension and alte…
2018
With conditions
32 Park Road Beer Seaton EX12 3HJ
Demolition of existing structure and replace with a single storey rear extension and alte…
East Devon
Planning Authority Score
6.1/10
Average
#92 of 292 councils
Relevant to this application:
Householder decisions
East Devon ranks #124 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
East Devon decision performance
Based on MHCLG data, 2025
89%
Overall approval rate
Above avg (87%) #134 of 292
93%
Householder approved
Above avg (90%) #124 of 292
69%
Decided in 8 weeks
Above avg (64%) #124 of 292
35%
Extended time limit
Below avg (40%) #98 of 292
69%
Minor dwellings approved
160 decided (1-9 homes)
73%
Major dwellings approved
15 decided (10+ homes)
90%
Change of use approved
20 decided
1,323
Total decisions
146 refused in 2025
