14 Edith Road London W14 9BA

Pending Consideration 2026/00104/VAR
Date received
2 Feb 2026
Date validated
2 Feb 2026
Postcode
W14 9BA

Description

Variation of Condition 2 (approved drawings) of planning application reference: 2025/00976/FUL dated 13th October 2025 for the "Erection of front and rear roof extensions including the formation of a hip to gable roof extension, and involving an increase in the ridge height to match no. 16 Edith Road; erection of an extension to the side of the main building and existing back addition at lower ground level to third floor level; erection of a rear extension at third floor level, over part of the existing back addition; erection of a part single part four storey extension at lower ground, upper ground, first and second floor level to the side and rear of the existing back addition; erection of a single storey outbuilding in the rear garden; excavation of part of the rear garden to form 2no. lightwells, in connection with the creation of a new basement level." Amendments sought to enlarge the proposed side infill extension to the rear elevation at first, second and third floor level to reflect the revised drawings.

Hammersmith and Fulham
Planning Authority Score
3.5/10
Below average
#217 of 292 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #278 out of 292. The council extends the time limit on 64% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision performance
Based on MHCLG data, 2025
97%
Overall approval rate
Above avg (87%) #3 of 292
98%
Householder approved
Above avg (90%) #14 of 292
34%
Decided in 8 weeks
Below avg (64%) #278 of 292
64%
Extended time limit
Above avg (40%) #276 of 292
97%
Minor dwellings approved
250 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
97%
Change of use approved
35 decided
1,401
Total decisions
39 refused in 2025