574 - 580 King's Road London SW6 2DY
Description
Submission of details of a Sustainable Drainage Strategy (SuDS), pursuant to Condition 7 of the planning permission reference: 2025/01090/FUL dated 27th November 2025.
Other new applications on this street
Nearby new applications
Pumping Station, 27-29 Lots Road, London, SW10 0QH
Internal and external alterations and repairs to make the building weather tight...
Pumping Station, 27-29 Lots Road, London, SW10 0QH
Internal and external alterations and repairs to make the building weather tight...
302-304 Fulham Road, London, SW10 9EP
Installation of AC condenser to rear elevation
49B And 51 New King's Road London SW6 4SE
Erection of a rear extension at second floor level, over part of the existing ba...
74 Flat Basement,Harwood Road,London,Hammersmith And Fulham,SW6 4PZ
Erection of a single storey rear extension to the side of the existing back addi...
8 Maisonette First And Second Floors,Moore Park Road,London,Hammersmith And Fulham,SW6 2JS
Replacement of existing dormer windows with new dormer windows in the front, rea...
Historical activity at this location
26 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #278 out of 292. The council extends the time limit on 64% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.
