Skinningrove Beck Between bridge at Stone Row; between junction of Zetland Row with Grove Hill and New Company Row Skinningrove

Pending R/2026/0391/CD
Date received
1 Jun 2026
Date validated
1 Jun 2026
Postcode
TS13

Description

Discharge of conditions 4 (Tree Protection), 5 (Highways Design and Materials), 6 (Stage 4 Road Safety Audit), 7 (Method of Works), 8 (Construction Management Plan, 9 (EA Protected Species), and 11 (BNG Plan) of planning permission R/2025/0606/CAM for the flood alleviation scheme involving removal of existing bridge at Stone Row and repair of flood defence; construction of replacement vehicle bridge across Skinningrove Beck; associated temporary works including temporary construction compound and associated access onto open space off Mill Lane and access (for construction traffic and local residents) through the Magpie Wood Caravans & Glamping site.

Redcar and Cleveland
Planning Authority Score
6.4/10
Average
#83 of 292 councils
Relevant to this application:
Householder decisions

Redcar and Cleveland ranks #188 out of 292 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision performance
Based on MHCLG data, 2025
97%
Overall approval rate
Above avg (87%) #5 of 292
97%
Householder approved
Above avg (90%) #37 of 292
59%
Decided in 8 weeks
Below avg (64%) #188 of 292
34%
Extended time limit
Below avg (40%) #89 of 292
81%
Minor dwellings approved
16 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
425
Total decisions
14 refused in 2025