Land North Of Mere Hall Farm, Bloxholm Lane, Branston And Mere
Pending
26/0660/DISCON
Description
Application to dischrage conditions 2 (construction method statement), 3 (materials-external surfaces) and 3 (lighting) of application 23/1043/FUL - Erection of pumping station and ancillary equipment, including formation of new site access, in connection with the Lincoln to Ancaster pipeline scheme (revised scheme to 21/0690/FUL)
North Kesteven
Planning Authority Score
6.6/10
Good
#75 of 292 councils
Relevant to this application:
Householder decisions
North Kesteven ranks #114 out of 292 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.
More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
North Kesteven decision performance
Based on MHCLG data, 2025
97%
Overall approval rate
Above avg (87%) #4 of 292
99%
Householder approved
Above avg (90%) #5 of 292
71%
Decided in 8 weeks
Above avg (64%) #114 of 292
45%
Extended time limit
Above avg (40%) #181 of 292
90%
Minor dwellings approved
71 decided (1-9 homes)
100%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
31 decided
637
Total decisions
18 refused in 2025
