Winslow To Upper Mill, Kingstone Winslow, Swindon, SN6 8NG
Pending
P26/V1506/LB - Other Development
Description
Replacement of existing roof slates with new Spanish slates including new roofing battens and breathable roofing membrane.
Nearby new applications
Historical activity at this location
19 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Approved
Upper Mill Kingstone Winslow Swindon SN6 8NG
Discharge of condition 3(Schedule of Materials) on application ref. P24/V1889/HH and cond…
2025
Approved
Upper Mill Kingstone Winslow Swindon SN6 8NG
Discharge of condition 3(Schedule of Materials) on application ref. P24/V1889/HH and cond…
2025
Approved
The Haven Kingstone Winslow Swindon SN6 8NG
Installation of an Electric Vehicle Charging unit. (As clarified by applicants email rece…
2025
Approved
The Haven Kingstone Winslow Swindon SN6 8NG
Installation of an Electric Vehicle Charging unit. (As clarified by applicants email rece…
2024
Approved
Upper Mill Kingstone Winslow Swindon SN6 8NG
Single storey extensions to replace existing conservatories, lean-to store, internal alte…
2024
Approved
Upper Mill Kingstone Winslow Swindon SN6 8NG
Single storey extensions to replace existing conservatories, lean-to store, internal alte…
2024
Approved
Upper Mill Kingstone Winslow Swindon SN6 8NG
Single storey extensions to replace existing conservatories, lean-to store, internal alte…
2024
Approved
Upper Mill Kingstone Winslow Swindon SN6 8NG
Single storey extensions to replace existing conservatories, lean-to store, internal alte…
2024
Approved
Spring Cottage Kingstone Winslow Swindon SN6 8NG
Demolition of existing porch and replacement with new entrance porch in the same position…
2024
Approved
Spring Cottage Kingstone Winslow Swindon SN6 8NG
Demolition of existing porch and replacement with new entrance porch in the same position…
2022
Approved
Cavalry Cottage Kingstone Winslow Swindon SN6 8NG
Single storey side extension with pitched roof to match existing.
2022
Approved
Cavalry Cottage Kingstone Winslow Swindon SN6 8NG
Single storey side extension with pitched roof to match existing.
2021
Approved
Spring Cottage Kingstone Winslow Swindon SN6 8NG
Demolition of existing porch and construction of new front entrance porch (as amended by…
2021
Approved
Spring Cottage Kingstone Winslow Swindon SN6 8NG
Demolition of existing porch and construction of new front entrance porch (as amended by…
2019
Refused
Sarsen Cottage Kingstone Winslow Swindon SN6 8NG
Change the use of the existing home office / annex to self-contained holiday accommodatio…
2019
Refused
Sarsen Cottage Kingstone Winslow Swindon SN6 8NG
Change the use of the existing home office / annex to self-contained holiday accommodatio…
2016
Approved
Telephone Box Cottage Kingstone Winslow SWINDON SN6 8NG
Discharge of conditions(s) 4 (Hard/soft landscaping), 5 (Levels), 7 (Visibility splays)…
2016
Approved
Telephone Box Cottage Kingstone Winslow SWINDON SN6 8NG
Non Material Amendment to application P16/V1196/FUL. 'Proposed demolition of existing cot…
2016
Approved
Telephone Box Cottage Kingstone Winslow SWINDON SN6 8NG
Proposed demolition of existing cottage and garage in favour of erection of two dwellings
Vale of White Horse
Planning Authority Score
4.9/10
Below average
#158 of 292 councils
Relevant to this application:
Householder decisions
Vale of White Horse ranks #190 out of 292 councils for householder decision speed. 49% of applications have the time limit extended, above the 40% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
Vale of White Horse decision performance
Based on MHCLG data, 2025
96%
Overall approval rate
Above avg (87%) #17 of 292
97%
Householder approved
Above avg (90%) #40 of 292
59%
Decided in 8 weeks
Below avg (64%) #190 of 292
49%
Extended time limit
Above avg (40%) #222 of 292
89%
Minor dwellings approved
79 decided (1-9 homes)
89%
Major dwellings approved
19 decided (10+ homes)
97%
Change of use approved
29 decided
986
Total decisions
44 refused in 2025
