Land south of Road 4 and west of Road 6, Rutherford Appleton Laboratory, Harwell Campus, Didcot, OX11 0QX
Pending
P26/V0795/FUL - Major Development
Description
Erection of a Class E building with associated infrastructure.
Historical activity at this location
27 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2025
Approved
R24, Land east of Road 8, Rutherford Appleton Laboratory, Chilton, Harwell Campus, Didcot, Oxfordshire, OX11 0QX
Planning Application for the proposed installation of three chemical waste storage contai…
2020
Approved
Building R92 Rutherford Appleton Laboratory Harwell Oxford Didcot OX11 0QX
Installation of additional extract flue from existing laboratory to increase capacity
2020
Approved
Building R92 Rutherford Appleton Laboratory Harwell Oxford Didcot OX11 0QX
Installation of additional extract flue from existing laboratory to increase capacity
2019
Approved
RFI Land west of Road 6 Rutherford Appleton Laboratory Didcot OX11 0QX
Variation of Conditions 2 - Approved plans on Application P18/V1996/FUL tfor removal of d…
2019
Approved
RFI Land west of Road 6 Rutherford Appleton Laboratory Didcot OX11 0QX
Variation of Conditions 2 - Approved plans on Application P18/V1996/FUL tfor removal of d…
2018
Approved
Cclrc Rutherford Appleton Laboratory Harwell Oxford Didcot OX11 0QX
Installation of additional COSHH & LEV extract system associated with additional equipmen…
2018
Approved
Cclrc Rutherford Appleton Laboratory Harwell Oxford Didcot OX11 0QX
Installation of additional COSHH & LEV extract system associated with additional equipmen…
2018
Approved
B115 Rutherford Appleton Laboratory Harwell Campus Didcot OX11 0QX
Variation of condition 2 - approved plans on application ref P18/V1431/FUL. Erection of n…
2018
Approved
B115 Rutherford Appleton Laboratory Harwell Campus Didcot OX11 0QX
Variation of condition 2 - approved plans on application ref P18/V1431/FUL. Erection of n…
2018
Approved
Building R26 Science and Technology Facilities Rutherford Appleton Laboratory Didcot OX11 0QX
2 x sign boards to the face of building
2018
Approved
Building R26 Science and Technology Facilities Rutherford Appleton Laboratory Didcot OX11 0QX
2 x sign boards to the face of building
2017
Approved
Building 151 Thomson Avenue Harwell Campus DIDCOT OX11 0QX
Change of use of Building 151 from Class B1 to a cat treatment centre.
2017
Approved
Building 151 Thomson Avenue Harwell Campus DIDCOT OX11 0QX
Change of use of Building 151 from Class B1 to a cat treatment centre.
2016
Approved
Building 31 Fermi Avenue Rutherford Appleton Laboratories Didcot OX11 0QX
Change of use from Offices to day nursery ( B1 to D1) and new external staircase
2016
Approved
Building R26 Rutherford Appleton Laboratory Harwell Oxford DIDCOT OX11 0QX
Installation of COSHH extract system.
2025
Approved
Building R1 Rutherford Appleton Laboratory Harwell Campus Didcot OX11 0QX
Variation of condition 5 on planning permission P23/V2546/FUL-changes to the Construction…
2025
Approved
Building R1 Rutherford Appleton Laboratory Harwell Campus Didcot OX11 0QX
Variation of condition 5 on planning permission P23/V2546/FUL-changes to the Construction…
2024
Approved
Building R1 Rutherford Appleton Laboratory Harwell Campus Didcot OX11 0QX
Non material amendment on application P23/V2546/FUL to amended external works layout, The…
2024
Approved
Building R1 Rutherford Appleton Laboratory Harwell Campus Didcot OX11 0QX
Non material amendment on application P23/V2546/FUL to amended external works layout, The…
2024
Approved
Land South East of Diamond Synchrotron Fermi Avenue Rutherford Appleton Laboratory Didcot OX11 0QX
Non material amendment to P22/V2864/FUL to change the approved art design. (Erection of t…
2024
Approved
Land South East of Diamond Synchrotron Fermi Avenue Rutherford Appleton Laboratory Didcot OX11 0QX
Non material amendment to P22/V2864/FUL to change the approved art design. (Erection of t…
2021
Approved
Building R4 Rutherford Appleton Laboratory Harwell OX11 0QX
Non-material amendment to replace the cement board over-cladding with a rendered insulati…
2021
Approved
Building R4 Rutherford Appleton Laboratory Harwell OX11 0QX
Non-material amendment to replace the cement board over-cladding with a rendered insulati…
2021
Approved
Cclrc Rutherford Appleton Laboratory Harwell Oxford Didcot OX11 0QX
Discharge condition 4 on planning application P20/V2079/FUL. (Raise the eastern half of t…
2021
Approved
Cclrc Rutherford Appleton Laboratory Harwell Oxford Didcot OX11 0QX
Discharge condition 4 on planning application P20/V2079/FUL. (Raise the eastern half of t…
Vale of White Horse
Planning Authority Score
4.9/10
Below average
#158 of 292 councils
Relevant to this application:
Major dwellings
Vale of White Horse ranks #190 out of 292 councils for householder decision speed. 49% of applications have the time limit extended, above the 40% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
Vale of White Horse decision performance
Based on MHCLG data, 2025
96%
Overall approval rate
Above avg (87%) #17 of 292
97%
Householder approved
Above avg (90%) #40 of 292
59%
Decided in 8 weeks
Below avg (64%) #190 of 292
49%
Extended time limit
Above avg (40%) #222 of 292
89%
Minor dwellings approved
79 decided (1-9 homes)
89%
Major dwellings approved
19 decided (10+ homes)
97%
Change of use approved
29 decided
986
Total decisions
44 refused in 2025