22 MORLEY LANE, STANLEY, ILKESTON, DE7 6EZ
Pending
PA/2026/0322 - Consent under Tree Preservation Orders
Description
Works To Protected Tree: DC5 TPO 62 -T1: Sycamore - Crown reduction of up to 2 metres
Nearby new applications
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Approved
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Single storey extension
2025
Approved
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Single storey extension
2024
Approved
10 Morley Lane Stanley Derbyshire DE7 6EZ
T1 - Norway Spruce - fell to ground level and remove all waste. Tree is growing in close…
2024
Approved
10 Morley Lane Stanley Derbyshire DE7 6EZ
T1 - Norway Spruce - fell to ground level and remove all waste. Tree is growing in close…
2024
Approved
1 Morley Lane Stanley Derbyshire DE7 6EZ
Tree in Conservation Area Notification: T1 - Cedar - Fell to ground level
2024
Approved
1 Morley Lane Stanley Derbyshire DE7 6EZ
Tree in Conservation Area Notification: T1 - Cedar - Fell to ground level
2023
Approved
Corner House Morley Lane Stanley Ilkeston, Derbyshire DE7 6EZ
Demolition of existing dwelling and erection of replacement dwelling
2023
Approved
Corner House Morley Lane Stanley Ilkeston, Derbyshire DE7 6EZ
Demolition of existing dwelling and erection of replacement dwelling
2023
Approved
22 Morley Lane Stanley Derbyshire DE7 6EZ
Works to trees in a conservation area: Reduce hedge by 50 % (2.5 meters) to bring in line…
2023
Approved
22 Morley Lane Stanley Derbyshire DE7 6EZ
Works to trees in a conservation area: Reduce hedge by 50 % (2.5 meters) to bring in line…
2023
Approved
9 Morley Lane Stanley Ilkeston, Derbyshire DE7 6EZ
T1 - Oak - Fell to ground level; T2 - Oak - Crown Reduce by 2 meters leaving a balanced c…
2023
Approved
9 Morley Lane Stanley Ilkeston, Derbyshire DE7 6EZ
T1 - Oak - Fell to ground level; T2 - Oak - Crown Reduce by 2 meters leaving a balanced c…
2022
Refused
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Construction of detached double garage to front/side elevation.
2022
Refused
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Construction of detached double garage to front/side elevation.
2022
Approved
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Fell 1 x Norway Spruce (T1).
2022
Approved
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Fell 1 x Norway Spruce (T1).
2021
Refused
30 Morley Lane Stanley Derbyshire DE7 6EZ
Erection of one dwelling house
2021
Refused
30 Morley Lane Stanley Derbyshire DE7 6EZ
Erection of one dwelling house
2021
Refused
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Single storey extension with additional accommodation and garaging
2021
Refused
Yew Tree Farm 39 Morley Lane Stanley Derbyshire DE7 6EZ
Single storey extension with additional accommodation and garaging
2016
Approved
Sunnyside Common Lane Stanley Common Derbyshire DE7 6EZ
SINGLE STOREY FRONT EXTENSION, TWO STOREY EXTENSION TO THE SIDE ELEVATION, FIRST FLOOR RE…
2016
Approved
1 Morley Lane Stanley Derbyshire DE7 6EZ
REMOVE TREE WITHIN A CONSERVATION AREA
2016
Approved
1 Morley Lane Stanley Derbyshire DE7 6EZ
REMOVE TREE WITHIN A CONSERVATION AREA
2016
Approved
33, Morley Lane, Stanley, Ilkeston, Derbyshire, DE7 6EZ
Fell Large Cedar Tree Overhanging The Road And Cottage.
2016
Approved
33, Morley Lane, Stanley, Ilkeston, Derbyshire, DE7 6EZ
Fell Large Cedar Tree Overhanging The Road And Cottage.
Erewash
Planning Authority Score
7.9/10
Good
#29 of 292 councils
Relevant to this application:
Householder decisions
Erewash ranks #135 out of 292 councils for householder decision speed. Only 26% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.
More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
Erewash decision performance
Based on MHCLG data, 2025
94%
Overall approval rate
Above avg (87%) #33 of 292
98%
Householder approved
Above avg (90%) #11 of 292
67%
Decided in 8 weeks
Above avg (64%) #135 of 292
26%
Extended time limit
Below avg (40%) #36 of 292
92%
Minor dwellings approved
48 decided (1-9 homes)
100%
Major dwellings approved
6 decided (10+ homes)
69%
Change of use approved
16 decided
389
Total decisions
23 refused in 2025