4 Ulviet Gate, High Legh, Knutsford, Cheshire East, WA16 6TT
Pending
26/1375/HOUS - Householder
Description
Erection of single-storey rear extension, first-floor side extension, alterations to fenestration, and solar panels.
Historical activity at this location
7 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
With conditions
5 Ulviet Gate, High Legh, Knutsford, Cheshire East, WA16 6TT
Oak - crown reduce by up to 2m using previous reduction points as guide Remove Major dead…
2023
With conditions
1, REPTON CLOSE, HIGH LEGH, WA16 6TS
Proposed two storey side extension, single storey rear extension, bay extensions to front…
2022
With conditions
1, ULVIET GATE, HIGH LEGH, CHESHIRE, WA16 6TT
Single storey rear extension
2019
With conditions
5 Ulviet Gate, High Legh, Knutsford, Cheshire East, WA16 6TT
SINGLE STOREY REAR EXTENSION WITH ORANGERY ROOF
2018
With conditions
18 Ulviet Gate, High Legh, Knutsford, Cheshire East, WA16 6TT
Part Single, Part Two Storey Rear Extension
2017
With conditions
3, CANDELAN WAY, HIGH LEGH, CHESHIRE, WA16 6TP
Proposed two storey and first floor side extension, single storey rear extension and asso…
2017
With conditions
22, ULVIET GATE, HIGH LEGH, WA16 6TT
Conversion of existing garage and construction of new link to form granny annexe
Cheshire East
Planning Authority Score
1.5/10
Poor
#282 of 292 councils
Relevant to this application:
Householder decisions
Cheshire East is one of the slowest councils in England for householder decisions, ranking #277 out of 292. The council extends the time limit on 68% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).
Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Cheshire East decision performance
Based on MHCLG data, 2025
87%
Overall approval rate
Above avg (87%) #163 of 292
90%
Householder approved
Above avg (90%) #185 of 292
34%
Decided in 8 weeks
Below avg (64%) #277 of 292
68%
Extended time limit
Above avg (40%) #282 of 292
73%
Minor dwellings approved
329 decided (1-9 homes)
77%
Major dwellings approved
22 decided (10+ homes)
79%
Change of use approved
116 decided
2,460
Total decisions
323 refused in 2025