11 Oliver Close Heybridge Maldon Essex CM9 4PJ
Pending
26/00351/TCA
Description
T1 - Silver Birch (Betula pendula) - Fell.
Nearby new applications
Historical activity at this location
8 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2024
With conditions
11 Rennie Walk Heybridge Maldon Essex CM9 4QH
Compliance with conditions notification 24/00257/HOUSE (Single story rear extension with…
2024
With conditions
11 Rennie Walk Heybridge Maldon Essex CM9 4QH
Compliance with conditions notification 24/00257/HOUSE (Single story rear extension with…
2021
Approved
34 Freshwater Crescent Heybridge Essex CM9 4PA
Proposed single storey rear extension to replace existing conservatory.
2021
Approved
Waterside House 11 Freshwater Crescent Heybridge Essex CM9 4PA
Ornamental Pear (T1) - reduce by 1 metre in height and 0.5 metre on all other aspects. Or…
2020
Approved
10 Stebbens Way Heybridge Essex CM9 4PU
Single storey rear conservatory
2020
Approved
10 Stebbens Way Heybridge Essex CM9 4PU
Single storey rear conservatory
2016
Approved
9 Stebbens Way Heybridge Essex CM9 4PU
Day room/conservatory
2016
Approved
1 Rennie Walk Heybridge Essex CM9 4QH
T2 Willow - Pollard to previous cuts.
Maldon
Planning Authority Score
4/10
Below average
#199 of 292 councils
Relevant to this application:
Householder decisions
Maldon ranks #165 out of 292 councils for householder decision speed. 46% of applications have the time limit extended, above the 40% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
Maldon decision performance
Based on MHCLG data, 2025
87%
Overall approval rate
Above avg (87%) #166 of 292
91%
Householder approved
Above avg (90%) #171 of 292
62%
Decided in 8 weeks
Below avg (64%) #165 of 292
46%
Extended time limit
Above avg (40%) #195 of 292
68%
Minor dwellings approved
56 decided (1-9 homes)
25%
Major dwellings approved
4 decided (10+ homes)
75%
Change of use approved
8 decided
394
Total decisions
52 refused in 2025
