Unit 1, Brierley Industrial Park, Stoneyford Road, Stanton Hill, Nottinghamshire
Pending
V/2026/0311
Description
Installation of 2 windows
Nearby new applications
Historical activity at this location
8 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2019
With conditions
32 High Street, Sutton In Ashfield, Nottinghamshire, NG17 3GA
Demolition of the existing rear extension and outbuilding, and the conversion of the grou…
2019
With conditions
32 High Street, Stanton Hill, Nottinghamshire, NG17 3GA
Demolition of the existing rear extension and outbuilding, and the conversion of the grou…
2019
With conditions
The Old Chapel, 66 New Lane, Sutton In Ashfield, Nottinghamshire, NG17 3GD
Change of use from storage (b8) to car repairs and car sales (suI generis)
2019
With conditions
The Old Chapel, 66 New Lane, Sutton In Ashfield, Nottinghamshire, NG17 3GD
Change of use from storage (b8) to car repairs and car sales (suI generis)
2017
With conditions
28 High Street, Sutton In Ashfield, Nottinghamshire, NG17 3GA
Alterations to front elevation
2017
With conditions
28 High Street, Sutton In Ashfield, Nottinghamshire, NG17 3GA
Alterations to front elevation
2016
With conditions
10 High Street, Sutton In Ashfield, Nottinghamshire, NG17 3GA
Change of use to hot food takeaway
2016
With conditions
10 High Street, Sutton In Ashfield, Nottinghamshire, NG17 3GA
Change of use to hot food takeaway
Ashfield
Planning Authority Score
5.2/10
Average
#133 of 292 councils
Relevant to this application:
Householder decisions
Ashfield ranks #102 out of 292 councils for householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
Ashfield decision performance
Based on MHCLG data, 2025
86%
Overall approval rate
Below avg (87%) #185 of 292
88%
Householder approved
Below avg (90%) #215 of 292
72%
Decided in 8 weeks
Above avg (64%) #102 of 292
36%
Extended time limit
Below avg (40%) #105 of 292
77%
Minor dwellings approved
62 decided (1-9 homes)
88%
Major dwellings approved
17 decided (10+ homes)
75%
Change of use approved
36 decided
414
Total decisions
60 refused in 2025