No.1 Dock and The Mole, Neptune Road, Barry Waterfront, Barry
Pending
2023/00051/HYB
Description
The proposals for the site are the subject of a hybrid application comprising: 1. Full planning permission for engineering works to raise the existing ground levels of the Mole site to a minimum of 9.00m AOD to mitigate against potential future flood risk. 2. Outline planning permission for the development of a watersports centre, associated college/education facility and café on the eastern part of the site. 3. Outline planning permission for residential development of up to 100 dwellings. 4. Outline planning permission for ancillary works, including access, parking, landscaping, public open space and other associated infrastructure.
Nearby new applications
Historical activity at this location
10 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2022
Approved
Unit 445, District Centre, Barry Waterfront, Ffordd Y Mileniwm, Barry
Change of Use from A3 Restaurant to Sui Generis Beauty Salon
2021
Approved
Dockside POS, part of Barry Waterfront development
Non Material Amendment - Raising levels by 500 mm in the public realm area, install dwarf…
2020
Approved
Asda Stores Ltd., Ffordd Y Mileniwm, Barry
Reconfiguration of storage areas and canopy
2019
Approved
Dockside Quay, Barry Waterfront
Variation of condition 14 of planning permission 2017/00476/RES, to allow temporary use o…
2018
Approved
Westhaven 3 (Dockside Quay), Barry Waterfront, Barry
Discharge of Conditions 2-Road Construction Details (new residential development), 6-Sche…
2019
Approved
Dockside Quay, Barry Waterfront
Discharge of Conditions 2 - Engineering, 3 - Lighting and 13 - Shop Front Design. Plannin…
2018
Withdrawn
Westhaven 3 (Dockside Quay) Barry Waterfront, Barry
Discharge of condition 9 of planning permission 2017/00476/FUL- means of enclosure
2018
Approved
Westhaven 3 (Dockside Quay), Barry Waterfront, Barry
Development of the site known as Dockside Quay for residential development, A3 units and…
2018
Approved
Land at Westhaven (Phase 3) Dockside Quay, Barry Waterfront, Barry
Non-Material Amendment - Approval is sought for an amendment to the parking provision, to…
2017
Approved
Dockside Quay, Barry Waterfront.
Development of the site known as Dockside Quay for residential development, A3 units and…