Manor Farm, Upton Folly, Upton Lovell, Warminster, BA12 0JN
Pending
PL/2026/02994
Description
Proposed Excavation for Formation of an Earthbank Slurry Store and a Concrete Pad for the Storage of Silage Feed for the Dairy Herd
Other new applications on this street
Historical activity at this location
8 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2023
With conditions
10 Manor Road, Upton Lovell, Warminster, BA12 0JN
Erect a single storey rear extension. Formalise an existing garage conversion to an annex…
2021
With conditions
MANOR FARM UPTON FOLLY UPTON LOVELL WARMINSTER WILTSHIRE BA12 0JN
The demolition of an existing cow accommodation building, and the construction of a repla…
2019
Approved
Manor Farm Upton Folly Upton Lovell BA12 0JN
Erection of steel portal framed agricultural building.
2019
With conditions
Manor Farm Upton Lovell Warminster BA12 0JN
Proposed agricultural storage building for cattle cubicle bedding and cattle feed. Consis…
2017
With conditions
Manor Farm Upton Lovell Warminster Wiltshire BA12 0JN
Construction of a general purpose agricultural storage building.
2017
With conditions
Manor Farm Warminster Upton Lovell BA12 0JN
Covering of existing concrete circular slurry store with a self-supporting cover to help…
Wiltshire
Planning Authority Score
3.4/10
Poor
#222 of 292 councils
Relevant to this application:
Householder decisions
Wiltshire is slower than most councils at deciding householder applications, ranking #232 out of 292. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application.
View full council performance
Wiltshire decision performance
Based on MHCLG data, 2025
93%
Overall approval rate
Above avg (87%) #72 of 292
95%
Householder approved
Above avg (90%) #92 of 292
52%
Decided in 8 weeks
Below avg (64%) #232 of 292
56%
Extended time limit
Above avg (40%) #259 of 292
80%
Minor dwellings approved
371 decided (1-9 homes)
85%
Major dwellings approved
59 decided (10+ homes)
92%
Change of use approved
157 decided
3,734
Total decisions
260 refused in 2025
