Sutton Bridge Memorial Park Sutton Bridge Spalding PE12 9SD
Pending
H18-0441-26
Description
Details of surface water drainage strategy (Condition 6 of H18-1242-25)
Other new applications on this street
Nearby new applications
Historical activity at this location
27 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2024
Refused
186 Bridge Road Sutton Bridge Spalding PE12 9SF
Demolition of Existing Buildings & Erection of Two Single Dwellings & Four Apartments
2024
Refused
186 Bridge Road Sutton Bridge Spalding PE12 9SF
Demolition of Existing Buildings & Erection of Two Single Dwellings & Four Apartments
2022
Approved
Land Rear of Post Office 158 Bridge Road Sutton Bridge Spalding PE12 9SF
Erection of pair of semi-detached dwellings - previously approved under H18-1070-19
2022
Approved
Land Rear of Post Office 158 Bridge Road Sutton Bridge Spalding PE12 9SF
Erection of pair of semi-detached dwellings - previously approved under H18-1070-19
2022
Approved
Bridge Hardware 57 Bridge Road Sutton Bridge Spalding PE12 9SD
Replacement of Shopfront Windows
2022
Approved
Bridge Hardware 57 Bridge Road Sutton Bridge Spalding PE12 9SD
Replacement of Shopfront Windows
2020
Approved
122 BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SF
Proposed Conservatory
2020
Approved
122 BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SF
Proposed Conservatory
2020
Approved
154 BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SF
Removal of flat roof and replace with pitched roof
2020
Approved
154 BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SF
Removal of flat roof and replace with pitched roof
2020
Approved
SALON BEAUTIFUL 134A BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SF
Change windows on front elevation and new front door
2020
Approved
SALON BEAUTIFUL 134A BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SF
Change windows on front elevation and new front door
2019
Approved
Land rear: Post Office 158 Bridge Road Sutton Bridge Spalding PE12 9SF
Residential development - pair of semi-detached dwellings
2019
Approved
Land rear: Post Office 158 Bridge Road Sutton Bridge Spalding PE12 9SF
Residential development - pair of semi-detached dwellings
2019
Approved
101 BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SD
Erection of 2 detached dwellings - outline approval H18-0509-16
2019
Approved
101 BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SD
Erection of 2 detached dwellings - outline approval H18-0509-16
2019
Approved
ST MATTHEWS CHURCH BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SD
Siting of Church Notice Board
2019
Approved
ST MATTHEWS CHURCH BRIDGE ROAD SUTTON BRIDGE SPALDING PE12 9SD
Siting of Church Notice Board
2018
Approved
190 Bridge Road Sutton Bridge Spalding PE12 9SF
Proposed alterations to vehicular access to include increased dropped kerb width
2018
Approved
190 Bridge Road Sutton Bridge Spalding PE12 9SF
Proposed alterations to vehicular access to include increased dropped kerb width
2017
Approved
Marlington Lodge 75 Bridge Road Sutton Bridge Spalding PE12 9SD
Proposed loft conversion
2016
Approved
Adjacent: 101 Bridge Road Sutton Bridge Spalding PE12 9SD
Residential development of 2 detached two-bedroom chalets
2016
Approved
Adjacent: 101 Bridge Road Sutton Bridge Spalding PE12 9SD
Residential development of 2 detached two-bedroom chalets
2016
Land rear: Post Office 158 Bridge Road Sutton Bridge Spalding PE12 9SF
Erection of two dwelling houses
2016
Land rear: Post Office 158 Bridge Road Sutton Bridge Spalding PE12 9SF
Erection of two dwelling houses
South Holland
Planning Authority Score
4.2/10
Below average
#188 of 292 councils
Relevant to this application:
Householder decisions
South Holland ranks #148 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
South Holland decision performance
Based on MHCLG data, 2025
82%
Overall approval rate
Below avg (87%) #243 of 292
91%
Householder approved
Above avg (90%) #178 of 292
65%
Decided in 8 weeks
Above avg (64%) #148 of 292
45%
Extended time limit
Above avg (40%) #186 of 292
62%
Minor dwellings approved
144 decided (1-9 homes)
73%
Major dwellings approved
11 decided (10+ homes)
75%
Change of use approved
16 decided
588
Total decisions
108 refused in 2025
