Ceme Innovation Centre Marsh Way Rainham
Pending
Q0122.26
Description
Biodiversity gain plan P1042.25 -Delivery of a shared use route through the Centre of Engineering and Manufacturing Excellence (CEME). The shared use route will go from the entrance to the site from the A13 Westbound off-slip to the exit road at the junction with Marsh Way.
Historical activity at this location
20 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
With conditions
Ceme Innovation Centre Marsh Way Rainham RM13 8EU
Delivery of a shared use route through the Centre of Engineering and Manufacturing Excell…
2024
With conditions
Tesco Vehicle Maintenance Unit, Consul Avenue Rainham RM13 8EU
Installation of 2.4m high perimeter fence at vehicle maintenance unit (southern site boun…
2022
With conditions
80 Courier Road Rainham RM13 8EU
Construction of a phased development comprising industrial buildings (Use Class E(g)(iii)…
2023
Approved
Ceme Innovation Centre, Marsh Way Rainham RM13 8EU
Certificate of Lawfulness for private hire operators license from a single office
2023
With conditions
CEME Campus Marsh Way Rainham RM13 8EU
Installation of 1982 roof mounted solar PV panels across three buildings
2023
Approved
Ceme Innovation Centre, Office 18 Marsh Way Rainham RM13 8EU
Certificate of Lawfulness for use of office for record keeping, receiving telephone calls…
2021
Approved
Plot 12 Beam Reach 5 London RM13 8EU
Approval of details pursuant to Condition 16 (Remediation Statement - Land Contamination)…
2021
Approved
Plot 12 Beam Reach 5 Manor Way Rainham RM13 8EU
Discharge of condition 13 from P1380.18
2020
With conditions
Plot 12 Beam Reach 5 London RM13 8EU
Application for a non-material amendment to planning permission Ref: P1380.18 dated 29/03…
2020
Approved
Plot 12 Beam Reach 5 Rainham RM13 8EU
P1380.18 - condition 13
2020
Withdrawn
Plot 12 Beam Reach 5 London RM13 8EU
P1380.18 Conditions(s) 16
2020
Approved
Plot 12 Beam Reach 5 London RM13 8EU
P1380.18 Conditions(s) 10
2020
With conditions
Plot 12 Beam Reach 5 London RM13 8EU
Non-Material Amendment to permission P1380.18 dated 29/03/2019 to allow for changes to th…
2020
Approved
Plot 12 Beam Reach 5 London RM13 8EU
Discharge of condition 13 (Cycle) pursuant to application P1380.18 dated 29/03/2019.
2020
Approved
Plot 12 Beam Reach 5 London RM13 8EU
Discharge of condition 5(Design Code) pursuant to application P1380.18 dated 29/3/2020.
2019
Approved
Plot 12 Beam Reach 5 Romford RM13 8EU
Discharge of conditions 19(Delivery and Servicing), 20(Construction Logistics Plan) and 2…
2018
With conditions
Plot 12 Beam Reach 5 Rainham RM13 8EU
Full application for industrial/commercial floorspace (B1c, B2, B8 use classes) with asso…
2018
With conditions
Centre for Engineering and Manufacturing Excellence Marsh Way Rainham RM13 8EU
Overflow Car Park and a Dedicated Van Park
2016
With conditions
CEME Marsh Way Rainham RM13 8EU
Change of use of 1,454 sq.m. of floor space in the West Wing of the main CEME training an…
2016
With conditions
Ceme Innovation Centre Marsh Way Rainham RM13 8EU
Construction of a new hydrogen storage and re-fuelling system
Havering
Planning Authority Score
2.4/10
Poor
#257 of 292 councils
Relevant to this application:
Householder decisions
Havering is slower than most councils at deciding householder applications, ranking #197 out of 292. 47% of applications have the time limit extended, above the 40% national average. Havering is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.
One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
Havering decision performance
Based on MHCLG data, 2025
73%
Overall approval rate
Below avg (87%) #286 of 292
81%
Householder approved
Below avg (90%) #267 of 292
57%
Decided in 8 weeks
Below avg (64%) #197 of 292
47%
Extended time limit
Above avg (40%) #201 of 292
43%
Minor dwellings approved
164 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
25%
Change of use approved
100 decided
1,476
Total decisions
401 refused in 2025