Causeymire Wind Farm Halkirk KW12 6UP
Pending
26/01783/PAN
Description
Causeymire Wind Farm - The Proposed Development would comprise the full repowering of the existing Causeymire Wind Farm to include the removal of the existing 21 turbines (100 m tip height), and the construction of up to seven new wind turbines, each of up to a blade tip height of 200 m and associated ancillary infrastructure. The total installed capacity of the proposed turbines would be approximately 48 MW.
Other new applications on this street
Glenerrick House Wester Drummond Whitebridge Inverness IV2 6UP
Installation of ground mounted solar PV array and battery storage
Maes Howe Balmacaan Drumnadrochit Inverness IV63 6UP
Demolition of existing garage block and construction of garage
Maeshowe Balmacaan Drumnadrochit Inverness IV63 6UP
Replacement garage