Land At (Phase 4A) Europarc Healing North East Lincolnshire
Pending
DM/0314/26/SCR
Description
Request for EIA screening opinion for the construction and operation of a new poultry processing facility to the west of Europarc, Grimsby
Historical activity at this location
5 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Scratch Meals Limited Humber Seafood Institute Origin Way Healing North East Lincolnshire DN37 9TZ
Alterations to the North Eastern elevation to Genesis Way, including installation of exte…
2022
With conditions
Scratch Meals Limited Humber Seafood Institute Origin Way Healing North East Lincolnshire DN37 9TZ
Retrospective permission for a storage container, installation of an additional refrigera…
2019
With conditions
Car Park At Europarc Origin Way Healing North East Lincolnshire
Extension of existing car park area to form addition staff and visitor car parking provis…
2018
Origin Two 2 Origin Way Healing Grimsby North East Lincolnshire DN37 9TZ
Test case
2016
With conditions
Humber Seafood Institute Origin Way Healing Grimsby North East Lincolnshire DN37 9TZ
Retrospective partial change of use of internal rooms from offices to production, install…
North East Lincs
Planning Authority Score
4.9/10
Below average
#155 of 292 councils
Relevant to this application:
Householder decisions
North East Lincs ranks #180 out of 292 councils for householder decision speed. 52% of applications have the time limit extended, above the 40% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
North East Lincs decision performance
Based on MHCLG data, 2025
95%
Overall approval rate
Above avg (87%) #23 of 292
97%
Householder approved
Above avg (90%) #31 of 292
60%
Decided in 8 weeks
Below avg (64%) #180 of 292
52%
Extended time limit
Above avg (40%) #234 of 292
98%
Minor dwellings approved
47 decided (1-9 homes)
92%
Major dwellings approved
13 decided (10+ homes)
86%
Change of use approved
21 decided
468
Total decisions
22 refused in 2025