Rosendale Road, Between Norwood Road And Tritton Road London SE24
Description
Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for the creation of a cycle lane, along with changes to junction geometry, footways, signage, vehicle and cycle parking and other associated works to the highway along Rosendale Road, as Phase 3 of the Brockwell Park to Gipsy Hill Healthy Route between the A205 South Circular and Park Hall Road (following and connecting to the Phase 1 and Phase 2 two-way cycle tracks installed along the eastern side of Rosendale).
Nearby new applications
69 Gipsy Road
Installation of external wall insulation to house (Class C3)
59 Alleyn Road London Southwark SE21 8AD
ID 7787 Yew tree 4m in height - Fell to ground level and replace with an 8-10cm ...
31 Croxted Road London Lambeth SE21 8SZ
Application for a Non-Material Amendment Following a Grant of Planning Permissio...
12C Alleyn Road London Southwark SE21 8AL
Construction of a rear extension, loft conversion, and the installation of a new...
23 Chalford Road London SE21 8BX
Application for a Certificate of Lawful Development (Proposed) with respect to t...
25 Alleyn Road London Southwark SE21 8AB
Works to a tree with a TPO: T1 & T2 - Lime Trees, to re-pollard at previous prun...
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Lambeth ranks #173 out of 292 councils for householder decision speed. 46% of applications have the time limit extended, above the 40% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.
