The Irish Chamber 1 Guildhall Yard London EC2V 5AE
Description
Alterations to a Listed Building including: (i) upgrades to mechanical heating systems, (ii) upgrade to and provision of new ground floor W/C's, (iii) upgrades to electrical wiring, lighting, alarm systems, (iv) installation of L.E.D lighting to replace existing on all floor levels, (v) installation of floor boxes on Ground and First floor levels, (vi) sustainability improvements including sealant to windows (viii) installation of a replacement kitchen alongside retained existing cupboards, (ix) installation of carpet, and; (x) associated minor repairs, redecorating and removal of redundant wiring.
Nearby new applications
The Gilbert, 40 Finsbury Square, London EC2A 1PX
Change of use of part of the lower ground from office (Class E(g)(i)) to a flexi
5 St Michael's Alley London EC3V 9DS
Internal alterations at basement level of Jamaica Wine House associated with ref...
Tenter House 45 Moorfields London EC2Y 9AE
Submission of details of Utility Connections Note, DNIA Resilient Route Map, Tha...
Tenter House 45 Moorfields London EC2Y 9AE
Submission of details of WSI for an Archaeological Evaluation and Archaeological...
1 St Martin's-le-grand London EC1A 4AS
Submission of details of Pre-Demolition Audit Report and Circular Economy Statem...
1-5 London Wall Buildings London Wall London EC2M 5PG
Submission of details of the proposed public water fountain pursuant to conditio...
Historical activity at this location
28 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 292. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.
