Land West Of Treviscoe Dryers Barton Lane Central Treviscoe St Austell Cornwall PL26 7QN
Pending
PA26/02554
Description
EIA Sceenning Opinion request for proposed development of 20MW electrolytic green hydrogen production facility together with a seperate electrical connection compound, associated underground electrical infastructure, hydrogen pipeline connections and ancillary works
Historical activity at this location
6 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2023
With conditions
Westbourne Little Treviscoe St Austell Cornwall PL26 7QN
Construction of one bedroomed self contained single storey annex to side of main house.
2019
With conditions
Ancia Little Treviscoe St Austell Cornwall PL26 7QN
Proposed rear extension
2018
With conditions
Westbourne Little Treviscoe St Austell PL26 7QN
Two storey extension to rear of existing dwelling with an attached raised terrace and a p…
2017
Approved
Land North Of Former Kernick Mica Dam Little Treviscoe St Austell Cornwall PL26 7QN
Lawful development certificate for the construction of an access (as authorised by PA13/0…
2017
With conditions
Land East Of Westbourne Little Treviscoe St Austell Cornwall PL26 7QN
Outline application for construction of new 3 bedroom single dwelling house (all matters…
2017
With conditions
Barn To Rear Of The Old Post Office Little Treviscoe St Austell Cornwall
Conversion and extension of existing stone barn
Cornwall
Planning Authority Score
7.4/10
Good
#38 of 292 councils
Relevant to this application:
Householder decisions
Cornwall is faster than most councils at deciding householder applications, ranking #86 out of 292. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.
More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
Cornwall decision performance
Based on MHCLG data, 2025
93%
Overall approval rate
Above avg (87%) #58 of 292
97%
Householder approved
Above avg (90%) #26 of 292
74%
Decided in 8 weeks
Above avg (64%) #86 of 292
37%
Extended time limit
Below avg (40%) #116 of 292
84%
Minor dwellings approved
1258 decided (1-9 homes)
90%
Major dwellings approved
70 decided (10+ homes)
93%
Change of use approved
182 decided
4,956
Total decisions
367 refused in 2025
