Holbrook Renewable Energy Centre Rother Valley Way Sheffield S20 3RW

Pending 26/00871/FUL
Council
Date received
25 Mar 2026
Date validated
15 Apr 2026
Postcode
S20 3RW

Description

Installation of an underground private electricity cable between the Holbrook Renewable Energy Centre and the Radius Aerospace site, together with a connection hub comprising battery energy storage systems (BESS), inverters, transformers, substation and 2.4 metre high fencing

Sheffield
Planning Authority Score
5/10
Average
#147 of 292 councils
Relevant to this application:
Householder decisions

Sheffield ranks #156 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sheffield decision performance
Based on MHCLG data, 2025
87%
Overall approval rate
Above avg (87%) #174 of 292
90%
Householder approved
Above avg (90%) #193 of 292
64%
Decided in 8 weeks
Above avg (64%) #156 of 292
34%
Extended time limit
Below avg (40%) #92 of 292
69%
Minor dwellings approved
140 decided (1-9 homes)
88%
Major dwellings approved
32 decided (10+ homes)
88%
Change of use approved
121 decided
1,765
Total decisions
226 refused in 2025