Teckno Developments Site Killingwoldgraves Lane Bishop Burton East Riding Of Yorkshire HU17 8QX
Pending
26/30191/CONDET
Description
Submission of details required by Conditions 7 (hard and soft landscape works) and 29 (landscaping improvements - biodiversity gain plan) and Statutory BNG of planning permission 25/00491/PLF
Other new applications on this street
Nearby new applications
Historical activity at this location
25 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
2025
Approved
Erection of a mixed use building consisting of a veterinary surgery (Use Class E(e) and e…
2023
Approved
Erection of 3 buildings for light industrial and/or storage and distribution use (B1c, B8…
2022
Approved
Erection of drive thru coffee shop with associated access, parking, electric vehicle char…
2022
Approved
Erection of 3 units for use as B1c (light industrial) and/or B8 (storage/distribution) an…
2021
Refused
Erection of a petrol filling station and ancillary shop, electric vehicle charging and as…
2020
Refused
Erection of a petrol filling station and ancillary shop, electric vehicle charging and as…
2020
Approved
Outline - Mixed use development comprising employment units (B1(c) and/or B8) and petrol…
2018
Refused
OUTLINE - Erection of 5 dwellings (Access to be considered)
2017
Approved
Erection of a building for Business (B1), General Industry (B2) and Storage/Distribution…
2017
Refused
Erection of a Factory Building for Use Classes B1, B2 and B8 and erection of replacement…
2025
Submission of details required by Condition 7 (hard and soft landscaping) and Condition 3…
2025
Approved
Submission of details required by Condition 6 (surface water drainage) and Condition 7 (f…
2025
Approved
Submission of details required by Condition 12 (Construction Environmental Management Pla…
2025
Approved
Submission of details required by Condition 20 (Wildlife Enhancement Plan (WEP)) of plann…
2025
Approved
Submission of details required by Condition 20 (improvements and widening of existing foo…
2025
Approved
Submission of details required by Conditions 5 (Construction Emissions Management Plan (C…
2025
Approved
Submission of details required by Condition 17 (access, vehicle parking, loading, off-loa…
2025
Approved
Variation of Conditions 7 (construction hours) and 14 (highway improvement) of planning p…
2025
Approved
Submission of details required by Condition 19 (disposal of foul sewerage) of planning pe…
2025
Approved
Submission of details required by Condition 19 (disposal of foul sewerage) of planning pe…
2025
Approved
Submission of details required by Condition 25 (highway improvement works - layout, drain…
2025
Approved
Submission of details required by Conditions 9 (Construction Method Statement (CMS)), 12…
2025
Submission of details required by Conditions 18 (scheme for the discharge of surface wate…
2025
Refused
Submission of details required by Conditions 6 (scheme for the discharge of surface water…
2024
Refused
Submission of details required by Condition 6 (Surface Water Drainage) and Condition 7 (F…
East Riding
Planning Authority Score
8.1/10
Excellent
#19 of 292 councils
Relevant to this application:
Householder decisions
East Riding is one of the fastest councils in England for householder decisions, ranking #8 out of 292. Only 15% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).
Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
East Riding decision performance
Based on MHCLG data, 2025
89%
Overall approval rate
Above avg (87%) #135 of 292
92%
Householder approved
Above avg (90%) #147 of 292
93%
Decided in 8 weeks
Above avg (64%) #8 of 292
15%
Extended time limit
Below avg (40%) #12 of 292
76%
Minor dwellings approved
185 decided (1-9 homes)
93%
Major dwellings approved
44 decided (10+ homes)
86%
Change of use approved
80 decided
1,878
Total decisions
199 refused in 2025
