Green Bank Spring Close Boughton NN2 8SJ
Pending
2026/1284/FULL
Description
Detached dwelling, double garage and detached annexe
Nearby new applications
Historical activity at this location
7 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2025
Approved
St Anthonys Spring Close Boughton NN2 8SJ
To demolish, remove and replace a concrete sectional garage destroyed by a falling tree (…
2025
Land At Spring Close Boughton Northampton NN2 8SJ
Change of land use to form 4no. new residential dwellings, attenuation pond, and landscap…
2025
Approved
2 Spring Close, Boughton, NN2 8SJ
Single storey front and side extension
2022
Approved
Church View Spring Close Boughton Northamptonshire NN2 8SJ
Construction of roof terrace to first floor rear elevation with metal balustrading and 1…
2021
Approved
Church View Spring Close Boughton Northamptonshire NN2 8SJ
Removal of existing tennis court and construction of proposed pool house.
2020
Approved
7 Spring Close Boughton Northamptonshire NN2 8SJ
Demolition of existing single storey extension. Construction of two storey side extension.
West Northamptonshire
Planning Authority Score
1.8/10
Poor
#272 of 292 councils
Relevant to this application:
Householder decisions
West Northamptonshire is one of the slowest councils in England for householder decisions, ranking #290 out of 292. The council extends the time limit on 75% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
West Northamptonshire decision performance
Based on MHCLG data, 2025
90%
Overall approval rate
Above avg (87%) #125 of 292
93%
Householder approved
Above avg (90%) #139 of 292
25%
Decided in 8 weeks
Below avg (64%) #290 of 292
75%
Extended time limit
Above avg (40%) #290 of 292
78%
Minor dwellings approved
177 decided (1-9 homes)
80%
Major dwellings approved
20 decided (10+ homes)
89%
Change of use approved
201 decided
1,812
Total decisions
182 refused in 2025
