5 Park Drive Grimsby North East Lincolnshire DN32 0EE

Pending DM/0271/26/TCA
Date received
14 Apr 2026
Date validated
14 Apr 2026
Postcode
DN32 0EE

Description

Tree Description: Two mature Lime Trees (Tilia spp.). Located adjacent to roadside boundary. Trees are of significant height with evident epicormic re growth and areas of deadwood throughout the crown Scope of Works 1. Deadwood Removal: Remove all dead, dying, and diseased wood throughout the crown of both trees. Includes branches of all diameters where reasonably practicable. Aim to improve safety and overall tree health 2. Epicormic Growth Reduction: Reduce approximately 30% of epicormic growth on both trees. Focus on: Dense clusters along main stems and lower scaffold limbs. Crossing and congested shoots. Retain sufficient growth to maintain tree vitality and natural form T3 Silver Birch (Betula pendula) Proposed Works Description: Reduce the crown of the mature Silver Birch by approximately 20% to improve overall shape, form, and crown density. Works will consist of selective reduction pruning, cutting back to suitable secondary growth points in accordance with good arboricultural practice (BS3998:2010). The reduction will: Maintain the natural form and visual amenity of the tree. Reduce elongated and pendulous growth to create a more compact crown. Avoid the creation of large wounds by targeting appropriate growth points. Ensure balanced weight distribution throughout the canopy. All works will be carried out sympathetically, retaining the trees characteristic light canopy and ensuring no over-reduction or topping occurs.

North East Lincs
Planning Authority Score
4.9/10
Below average
#155 of 292 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #180 out of 292 councils for householder decision speed. 52% of applications have the time limit extended, above the 40% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision performance
Based on MHCLG data, 2025
95%
Overall approval rate
Above avg (87%) #23 of 292
97%
Householder approved
Above avg (90%) #31 of 292
60%
Decided in 8 weeks
Below avg (64%) #180 of 292
52%
Extended time limit
Above avg (40%) #234 of 292
98%
Minor dwellings approved
47 decided (1-9 homes)
92%
Major dwellings approved
13 decided (10+ homes)
86%
Change of use approved
21 decided
468
Total decisions
22 refused in 2025