Mount House Mount Lane Springwell Gateshead NE9 7UQ
Pending
26/00543/TPA
Description
Works to trees - T1 (Sycamore) - Fell to ground level, T2 (Horse Chestnut) - Remove snapped limb, remove limb with girdle approx 2.5m, remove lower branches by 20%, T3 (Horse Chestnut) - Crown lift by 20%, remove large weak limb approx 2.5m
Other new applications on this street
Historical activity at this location
7 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2021
Approved
The Chase Mount Lane Springwell Gateshead NE9 7UQ
Demolition of existing stables, erection of two storey extensions to front, rear and side…
2022
Approved
8 Sycamore Grove Springwell Gateshead NE9 7SE
T1,T2,T3 and T4 Sycamore - Remove deadwood, reduce laterally by 3metres and remove overha…
2021
Approved
Land To The North Of Mount Lane Springwell Gateshead
Partial discharge of condition 12 (tunnelling methodology) attached to planning applicati…
2019
Approved
Land North Of Mount Lane Springwell NE9 7UQ
Laying of underground water mains connections to the Carr Hill water main (in connection…
2019
Approved
8 Sycamore Grove Springwell Gateshead NE9 7SE
Erection of attached garage to side including the provision of first floor bedroom and in…
2017
Approved
Mount House Cottage Mount Lane Springwell Gateshead NE9 7UQ
Erection of a single storey extension to side and rear.
Sunderland
Planning Authority Score
6.6/10
Good
#77 of 292 councils
Relevant to this application:
Householder decisions
Sunderland ranks #100 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
Sunderland decision performance
Based on MHCLG data, 2025
91%
Overall approval rate
Above avg (87%) #107 of 292
95%
Householder approved
Above avg (90%) #88 of 292
73%
Decided in 8 weeks
Above avg (64%) #100 of 292
36%
Extended time limit
Below avg (40%) #113 of 292
82%
Minor dwellings approved
28 decided (1-9 homes)
91%
Major dwellings approved
23 decided (10+ homes)
70%
Change of use approved
47 decided
578
Total decisions
52 refused in 2025
