Trinity Wharf High Street Hull HU1 1QE

Pending Consideration 26/00309/LAW
Council
Date received
31 Mar 2026
Date validated
31 Mar 2026
Postcode
HU1 1QE

Description

We have been appointed to carry out fire remediation work on the building as part of the Cladding Safety Scheme. The remediation scope includes the removal of combustible materials within the external wall build up and timber decking on balconies which will be replaced with a non-combustible material which is of a like for like match in appearance. We are also installing a new cavity barrier system. Significant cracking in the brickwork has also been identified therefore, we'll survey to identify the cause and remediate.

Hull
Planning Authority Score
2.7/10
Poor
#242 of 292 councils
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications, ranking #199 out of 292. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision performance
Based on MHCLG data, 2025
92%
Overall approval rate
Above avg (87%) #83 of 292
90%
Householder approved
Above avg (90%) #187 of 292
57%
Decided in 8 weeks
Below avg (64%) #199 of 292
55%
Extended time limit
Above avg (40%) #252 of 292
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
10 decided (10+ homes)
89%
Change of use approved
37 decided
412
Total decisions
35 refused in 2025