Cambridge Waste Management Park Ely Road Landbeach Cambridgeshire CB25 9PH
Description
Submission of details required by condition 11 (external lighting) of planning permission 25/02020/S73
Other new applications on this street
Nearby new applications
Hill Farm Chittering Drove Waterbeach Cambridgeshire CB25 9PW
Side extension to existing outbuilding and remove double timber doors to front a...
Hill Farm Chittering Drove Waterbeach Cambridgeshire CB25 9PW
Side extension to existing outbuilding and remove double timber doors to front a...
Hill Farm Chittering Drove Waterbeach Cambridgeshire CB25 9PW
Side extension to existing outbuilding and remove double timber doors to front a...
Land North East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire
To discharge Conditions 3 (Surface Water Management), 5 (CEMP), 6 (Decommissioni...
Cambridge Waste Management Park Ely Road Landbeach Cambridgeshire CB25 9PH
Submission of details required by condition 11 (external lighting) of planning p...
Cambridge Waste Management Park Ely Road Landbeach Cambridgeshire CB25 9PH
Submission of details required by condition 11 (external lighting) of planning p...
Historical activity at this location
7 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Cambridge is one of the fastest councils in England for householder decisions, ranking #24 out of 292. Only 26% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).
