57 Ormerod Road Kingston Upon Hull HU5 5TS
Pending Consideration
26/00286/FULL
Description
Proposed First-Floor Extension
Historical activity at this location
5 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2021
Approved
38 Ormerod Road Kingston Upon Hull HU5 5TS
Erection of a two storey rear extension with a flat roof (4m long x 4.425m wide x 5.825m…
2020
Approved
19 Kirkstone Road Kingston Upon Hull HU5 5TX
Erection of single storey rear extension (max 3.6m long x max 4.65m wide x max 2.95m high)
2019
Approved
22 Ormerod Road Kingston Upon Hull HU5 5TS
Erection of a two storey rear (3.5m long x 6m wide x 2.525m high) and side extension (5.5…
2019
Approved
36 Ormerod Road Kingston Upon Hull HU5 5TS
Proposed first floor extension above existing ground floor extension (4.044m long x 4.36m…
2018
Approved
83 Ormerod Road Kingston Upon Hull HU5 5TS
Erection of a two storey rear extension ( max 6.6m long x max 4.7m wide x max 5.63m high…
Hull
Planning Authority Score
2.7/10
Poor
#242 of 292 councils
Relevant to this application:
Householder decisions
Hull is slower than most councils at deciding householder applications, ranking #199 out of 292. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).
Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application.
View full council performance
Hull decision performance
Based on MHCLG data, 2025
92%
Overall approval rate
Above avg (87%) #83 of 292
90%
Householder approved
Above avg (90%) #187 of 292
57%
Decided in 8 weeks
Below avg (64%) #199 of 292
55%
Extended time limit
Above avg (40%) #252 of 292
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
10 decided (10+ homes)
89%
Change of use approved
37 decided
412
Total decisions
35 refused in 2025
